BREWERY ENFIELD

Matthew Grahame Limited carried out works to the fit out to this 100,000 square foot brewery project in Enfield. The project consisted of a series of labs and production areas which required new jumbo stud walls to 6m high, wall linings to perimeter walls, new lay in grid ceilings, toilet blocks and tea points for the main production staff on the factory floor.

We also fitted out the office area with new solid and glazed partitions, timber doors and frames, plasterboard
and lay in ceilings and tea points.